Table 5 Estimated budget requirement to cover entire at-risk population for each operational district (USD)

From: The costs and logistics of distributing ‘forest packs’ containing novel vector control tools to forest-exposed populations in Cambodia

Province, District

Total Population

Estimated at-risk population in district

Total Cost—Base Case Scenario

Total Cost—Low Cost Long Duration VPSR Only

Cost per Capita (Whole District)

Kampong Speu, Phnom Srouch

9562

1945

269,013

27,386

28.13

Mondulkiri, Sen Monorom

26,026

17,315

2,394,838

243,795

92.02